UNDP-HQ - SOUTH SUDAN
Procurement Process
RFQ – Request for quotation
Office
UNDP-HQ – SOUTH SUDAN
Deadline
31-Oct-25 @ 12:00 PM (New York time)
Published on
08-Oct-25 @ 12:00 AM (New York time)
Reference Number
UNDP-HQ-01921,2
Contact
Domenico De Pinto – [email protected]
This specific tender is managed via the new supplier portal system of UNDP Quantum. If you are interested in submitting a bid for this tender, you must subscribe following the instructions in the user guide. If you have not registered a profile with this system, you can do so by following the link for Supplier Registration.
If you already have a supplier profile, please access the negotiation using quicklink or please login to the Supplier Portal, then search for the negotiation using the reference number UNDP-HQ-01921,2, following the instructions in the user guide.
Introduction
Dear Supplier,
The UNDP South Sudan CO, in collaboration with the UNDP ITM Green Energy Team, has implemented a solar PV system at its premises. The system is connected to an oversized diesel generator, which will now be replaced with the 290kVa generator, operated remotely by the system.
The primary objective of the smart solar turnkey PV system is to deliver a reliable and cost-effective green energy solution, enhanced with integrated smart features such as security and adaptability. As it is intended to serve as a national and international showcase, UNDP ITM requires high quality and performance standards. This document defines the site specific information, minimum technical requirements and installation requirements for the project.
The system is designed to enhance the energy supply for the UNDP premises. At present, the compound relies on a solar PV system with generators integrated into the systems. This generator is meant to replace one of the oversized generators on site.
The vendor shall submit a comprehensive proposal for a Diesel Generator based on the following scope of work:
Supply and delivery (DPU incoterms) of a Diesel Generator with a capacity of 290 kVa
Installation is not in the scope of the tender.
Vendors are required to confirm their acknowledgment and understanding of all requirements by completing a compliance checklist (Appendix I), and commit to adhering to the activities, deliverables, and timelines specified throughout this document.
All the requirements will be evaluated on a pass/fail basis, so if compliant with the requirements set, the supplier’s quote needs to attach proofs of compliance.
in case of issues with the Quantum platform please contact [email protected] and/or [email protected]
Amendment
Following comments from vendors and reviewing the need of the facility, we are amending the requirement for the Generator regarding the enclosure reducing it from IP66 to IP55
Documents :
Negotiation Document(s)
(Before Accessing other negotiations Document(s), please click on this link)
To help us track our procurement effort, please indicate in your email where (globalvacancies.org) you saw this tender/procurement notice.