21-Sep-25 @ 12:59 PM (New York time)
Office
UNDP-VNM – VIET NAM
Deadline
21-Sep-25 @ 12:59 PM (New York time)
Published on
29-Aug-25 @ 12:00 AM (New York time)
Reference Number
UNDP-VNM-01694
Contact
Procurement Associate – [email protected]
This specific tender is managed via the new supplier portal system of UNDP Quantum. If you are interested in submitting a bid for this tender, you must subscribe following the instructions in the user guide. If you have not registered a profile with this system, you can do so by following the link for Supplier Registration.
If you already have a supplier profile, please access the negotiation using quicklink or please login to the Supplier Portal, then search for the negotiation using the reference number UNDP-VNM-01694, following the instructions in the user guide.
Introduction
The objective of this assignment is to conduct surveys, consultations and develop architectural and technical designs for disaster-resilient community shelters in Son La Province, with the aim of obtaining approval from the local authorities and ensuring the following:
– Multi-functionality: The shelters should serve both as everyday community spaces and as safe havens during disasters.
– Disaster and climate resilience: The design must withstand local hazards such as flash floods, landslides, and storms, and make use of local materials and knowledge.
– Cultural relevance and inclusion: Designs should reflect local architectural identity, traditions, and meet the needs of the community, particularly ethnic minorities, women, the elderly, and persons with disabilities.
– Technical compliance: Structures must comply with Vietnamese codes, international guidelines, specifically referring to the Japanese National Disaster Shelter Operation Guidelines and build on lessons from past projects in Viet Nam’s mountainous areas.
– Sustainable and integrated systems: Incorporate rooftop solar PV systems for critical loads and underground rainwater harvesting to support the shelter for 3 (Emergency period) to 7 days (Recovery period).
– Maintainability: Materials and finishes shall be weather-resistant, termite-proof, and environmentally sustainable, selected based on local availability and durability under the prevailing local climate.
Documents :
Negotiation Document(s)
(Before Accessing other negotiations Document(s), please click on this link)
To help us track our procurement effort, please indicate in your email where (globalvacancies.org) you saw this tender/procurement notice.